Builders & Designers
Materials, Specification & Finish Coordination
Send us plans, a finish schedule, or a lot list. We'll review the materials with you across flooring, tile, stone, and slab counters, and confirm availability and pricing in a written quote.
Northern Lights Design is a specialty materials supplier — we don't perform installation or fabrication. Your crews install; we make sure the right material shows up at the right time.
What a Trade Account Gets You
One Source for Every Category
Flooring, tile, stone, and slab counters from one team, so you're not chasing four vendors for one house. Contact us to discuss your project and current terms.
Plan & Finish Schedule Review
Send us plans or a finish schedule and we'll review the materials involved with you, then confirm what we can supply in a written quote.
Clear Material Scope
We quote materials separately from installed cost, so it is clear what is ours and what belongs to your installer.
Sample & Display Support
Sample boards for your clients, checked-out samples for a design meeting, and reserve holds on a colorway while a homeowner decides.
Lead-Time Confirmation
Before you commit a date to a client, we confirm current availability in writing. Slab, imported tile, and special-order hardwood get flagged early so your schedule holds.
Staging & Job-Site Delivery
Material staged at our Columbia Falls warehouse and delivered when the trade is ready — not stacked in a framed house for a month collecting drywall dust.
Six Allowance Mistakes That Become Change Orders
These are the finish-stage disputes we watch play out most often on Flathead Valley builds — and how to write the allowance so they don't.
Allowance quoted as material-only, sold as installed
Write allowances as material + freight + delivery, and state clearly that labor, subfloor prep, and demo are separate. This single line prevents most finish-stage disputes.
Waste factor omitted
Plan 7–10% on straight-lay plank, 12–15% on diagonal or herringbone patterns, and more on small, cut-heavy rooms. An allowance built on net square footage is short before it starts.
Trim, transitions, and stair parts forgotten
Stair noses, reducers, T-molds, and shoe can add meaningfully to a whole-home package — especially with special-order or color-matched components that carry their own lead time.
Setting materials and underlayment unbudgeted
Thinset, membrane, grout, sealer, sound underlayment, and moisture barrier are real line items. On a tile-heavy house they're not a rounding error.
No ordering deadline in the schedule
Back-date the order from the install date using the confirmed lead time, not the optimistic one. We flag deadlines for slab, imported porcelain, and special-order wood.
Client upgrades handled verbally
Every upgrade should generate a written material delta against the allowance before the order is placed. We'll issue the revised material quote so your change order is documented.
Where to Go From Here
Browse the full brand and specification directory, stock up at the Sundry Pro Shop counter in Columbia Falls, review our warranty structure, or see completed project case studies. Working as a general contractor sourcing a full material package or an interior designer building a finish schedule? Those pathways go deeper on documentation, freight, and specification. Specifying for a hotel, restaurant, or multifamily property instead? Start with our commercial pathway.