Our Process
How a Project Works, Step by Step
Eight stages from first conversation to warranty follow-up — with honest timing, a clear split of who owns what, and no ambiguity about installation.
Consultation
We learn the project: rooms, rough square footage, timeline, target budget, and any known problems — a damp basement, a radiant slab, a pet, a rental turnover schedule.
More details
No obligation.
What to bring
What to bring
- •Rough measurements or a floor plan
- •Photos of the space
- •A cabinet door, paint chip, or inspiration image
- •Your target budget range
Material Selection
We narrow to two or three product lines that fit the room's moisture, traffic, and light — not a catalog dump.
More details
You'll see full-size racks, slabs, and tile boards in Lakeside, or trade samples and LVP in Kalispell.
What to bring
What to bring
- •Time to compare in person
- •Any samples you've already collected
Samples at Home
Flathead Valley winter light is low, cool, and snow-reflected.
More details
It changes how oak tone, grout color, and quartz veining read. Live with the finalists in the actual room before deciding.
What to bring
What to bring
- •Patience — this step prevents the most expensive kind of regret
Written Materials Quote
Itemized: field material, waste allowance, trim and transitions, underlayment or setting materials, freight, and delivery.
More details
Installation labor is not included and is quoted separately by your installer, so you always know which number is whose.
What to bring
What to bring
- •Final measurements from your installer, if available
Lead-Time Confirmation & Order
We verify current availability before the order is placed.
More details
In-stock product can move in days; standard orders typically run 1–3 weeks; slab, imported tile, and special-order hardwood can run 4–8 weeks or longer. Your installer schedules against the confirmed date, not an optimistic one.
What to bring
What to bring
- •A deposit for special-order items
Staging & Delivery
What to bring
What to bring
- •A confirmed install date and site access
Installation
Northern Lights Design is a specialty materials supplier — we don't perform installation.
More details
You hire your installer directly, and we're glad to refer qualified independent professionals we've worked alongside in the Flathead Valley. We stay available to your installer for product questions throughout.
What to bring
What to bring
- •Acclimation time for wood products, per the manufacturer
Warranty & Follow-Up
Product defects are covered by the manufacturer's warranty, which we help you register and pursue.
More details
Workmanship is covered by your installer. We keep your order record so a future repair or addition can be matched to the original dye lot and product line.
What to bring
What to bring
- •Your order paperwork and any leftover attic stock
A Clear Split of Responsibility
Northern Lights Design is a specialty materials supplier — we don't perform installation or fabrication. Here's exactly where each party's responsibility begins and ends.
Northern Lights Design
Responsibilities
- •Product selection guidance
- •Finish coordination across categories
- •Sourcing and ordering
- •Lead-time confirmation
- •Freight and warehouse staging
- •Local delivery coordination
- •Manufacturer warranty support
Your installer
Responsibilities
- •Site measurement
- •Subfloor evaluation and preparation
- •Demolition and disposal
- •Acclimation handling
- •Installation labor
- •Workmanship warranty
You
Responsibilities
- •Selecting and contracting your installer
- •Approving the final material selection
- •Confirming quantities against your installer's measurements
- •Scheduling site access
For the full warranty breakdown between manufacturer, supplier, and installer, see our warranty page.
Start Where You Fit
The process above applies to every project, but the first conversation differs by audience. Homeowners start with a design and materials consultation. Builders and designers start with our builder and designer resources. Commercial buyers start with a specification and lead-time review.
